成人亚洲性情网站www在线观看,美女黄网站永久免费观看网站,亚洲av国产精品无码市川京子,人妻熟妇乱又伦精品视频

Your Position: Home > Support > Service Center

Notes for reuse of Lyboa pump of ZYD transformer oil filter

2019/8/1??????view:

  The pump must be stored in a dry place before it returns to the workplace again. Better at room temperature (200C). Before the pump is withdrawn from the workplace, it should be removed from the vacuum system, washed with dry nitrogen and replaced with oil. The inlet and outlet of the pump must be sealed with the shipping seals at the time of delivery. The gas town must be closed. If the pump is idle for a long time, it should be sealed with plastic bags and desiccant.

  If the pump has been idle for more than a year, it must be maintained in a standard way and oil must be changed before the pump is put into operation again. We recommend that you contact the LEYBOLD manufacturer for maintenance services.

  Standard pumps are not suitable for installation in explosive dangerous areas. Please contact us when you intend to apply this method. Before installing the pump, it must be reliably disconnected from the power supply in order to prevent accidental start-up of the pump. Pumps can only be installed by qualified and well trained personnel. All safety regulations should be observed.

  Installation of ZYD oil filter Lyboa pump for reuse:

  In order to ensure safe start-up, it is necessary to proceed step by step according to the following instructions.

  The start-up can only be carried out by trained full-time personnel.

  SOGEVAC can be installed on any flat, horizontal plane. Under the four legs, there are metric threaded holes for fixing pumps.

  If the pump is inclined, the oil level can not be correctly read out. The pump is in danger of running dry.

  According to the different use of oil, the ambient temperature of the pump should be between 12 (55) and 40 (104). By improving the pump or replacing different types of oil, the pump can operate at lower ambient temperature. Please consult us about these questions.

  In order to ensure a good cooling of the pump, there should be enough space in the intake and exhaust outlets for maintenance and repair. Make sure the motor air intake is clean and clean.

  1. Connect to the system

  Standard pumps are not suitable for installation in explosive dangerous areas. When you plan to do so, please consult us. Before installing the pump, it must be reliably cut off from the power supply to prevent unintentional starting of the pump. The pump can only be installed by qualified and trained professionals.

  Comply with all safety regulations.

  2. Inlet side

  The intake flange of the pump is connected by internal threads. The pump can be connected to the vacuum system with suitable connectors.

  The cross section of the intake pipe should be at least the same as that of the intake port. If the intake pipe diameter is too small, the pumping speed will be reduced.

  We recommend using LOCTITE or TEFLON tape for threaded joints to ensure vacuum sealing. (especially when dangerous gases)

  3. Installation Warning of ZYD Oil Filter Lyboa Pump

  The pump should be connected to the intake pipe without any stress. Hose or pipe fittings are used in intake and exhaust pipes for easy removal during pump maintenance.

  - The maximum import pressure shall not exceed atmospheric pressure (about 1013 mbar). When there is excessive pressure in the import, the pump shall not be started.

  - The type of material used in the installation of pipes should take into account the type of gas pumped. The same is true for seals.

  If the process gas contains dust, dust filters must be installed in addition to random dust filters. We recommend that dust filters be installed horizontally with tees (3/13) or elbows (3/14). This ensures that no dust particles fall into the intake when the filter is removed. Import filters with different filter elements. Metal filter can prevent solid particles such as paper and plastics from entering the pump; paper filter can remove small particles such as dust and powder less than 1 micron; activated carbon filter can absorb chemical vapor such as acid and solvent. If the activated carbon filter is stored in a humid place, it should be dried at 212 for 2 hours before use.

  When extracting steam, we recommend installing condensers at the inlet and outlet sides.

  When pumping dangerous gas, the intake pipe must be tight.

  Solid particles or liquids are never allowed to enter the pump.


三上悠亚在线| 欧美交换国产一区内射| 情人在线观看| 人体内射精一区二区三区| 师尊被迫张腿承欢男男H漫画| 丝袜 亚洲 另类 欧美 变态| 精品国产日韩欧美一区二区三区| 蜜桃成熟时 电影| 国产欧美日韩综合精品二区| 精品无码黑人又粗又大又长AV| 同桌上课脱裙子让我帮他自慰| 被夫の上司に犯中文字幕| 国色天香A区与B区| 黑人刚破完处就三p| 野花香高清视频在线观看免费| 精品国产三级a在线观看| 中文字幕蜜臀AV熟女人妻| 美女被躁到高潮嗷嗷叫视频| av免费观看| FREE性VIDEOXXX欧美| 精品无码国产自产在线观看水浒传| 久久成人无码国产免费播放| 少妇AV射精精品蜜桃专区| 老扒夜夜春宵第二部的| 久久婷婷人人澡人人爽人人爱| 国产做a爱免费视频在线观看| 无码一区二区三区在线| 亚洲中文久久久久久精品国产| 精品国产毛片A片久久久| 日韩电影一区二区三区| 老旺的大肉蟒进进出出次视频| 国产av在线观看| 亚洲成A人无码亚洲成A无码AV| 久久99精品久久久久久国产 | 日日夜夜电影| 凸凹人妻人人澡人人添| 办公室扒开奶罩揉吮奶头a片| 国产日产欧产精品| 乱操| 色综合天天综合网国产成人网| 无遮挡1000部拍拍拍免费|